Bosch Research Centre

General

Project: Bosch Research Centre
Building Type: Research buildings/Laboratory
Address: Perouser Straße 100
Zip/City: 71272 Renningen
Country: Germany
Completion: from 2013 to 2015

Description

Project: Bosch Research Centre
Description:

China, Russia, Japan, the USA, Germany – the company Bosch established an international network
of research centres in its corporate history, which goes back more than 130 years. With the thought of
improving the network between those centres, the company decided to establish a central research location. In Renningen, Baden-Wuerttemberg, Bosch has obtained a 32-hectare area on a former drill ground of the German Air Force. Using an investment volume of more than € 300 million, 14 buildings have been built in a three-year construction period so far. Currently, there are 9 laboratory and factory buildings as well as one clean room building on the innovation campus. The administration of the site is placed in a distinctive, 60 metres high office building, which also forms the centrepiece of the complex.

As a part of the centre´s construction, Lindner was contracted with an extensive interior fit-out package, which included performances in the administration building and all research buildings. The wide variety of demands that came with the project could be met by a cooperation of multiple specialist departments within Lindner Group. The performances, which were delivered under the leadership of Lindner Reinraumtechnik GmbH, included: dry construction works, ceiling systems, partition systems, floor systems and doors. Numerous custom-made solutions, such as 7-metres high laboratory walls, have been implemented to meet the sophisticated specifications.

Products

System
Amount
Unit
Systems
Exterior ceilings 600 sqm
Grid ceilings 800 sqm
Heated and chilled ceilings 2,000 sqm
Partition systems 5,000 sqm
Tube frame doors 200 Pcs.
Wooden Doors 450 Pcs.
Laboratory partitions 9,600 sqm
Fire protection doors 40 Pcs.
Plasterboard ceiling systems
Mineral fibre ceilings 34,000 sqm
Plasterboard ceilings 2,500 sqm
Perforated plasterboard ceilings 2,500 sqm
Plasterboard accessories
Absorber 1,200 Pcs.
Raised floor systems
NORTEC 4,900 sqm
Hollow floor systems
FLOOR and more® 200 sqm
F0 Metal ceiling
LMD-B - Post cap ceilings 2,500 sqm
LMD-K - Cassette ceilings 250 sqm
LMD-St - Expanded Metal ceilings 100 sqm

Companies involved

Client: Robert Bosch GmbH, Gerlingen, Germany

Downloads

« Back to list