Raumedic new production building

General

Project: Raumedic new production building
Building Type: Production rooms
Address: Hermann-Staudinger-Straße 2
Zip/City: 95233 Helmbrechts
Country: Germany
Completion: from 2022 to 2023

Description

Project: Raumedic new production building
Description:

RAUMEDIC AG develops plastic-based solutions for medical and pharmaceutical applications as well as products for intensive medical care. With five administrative and production locations worldwide, the company has a total of around 10,000 m² of cleanroom space. Nevertheless, space resources were becoming scarce due to the increased demand for silicone tubing: RAUMEDIC therefore planned a generous extension with two production buildings and numerous cleanrooms at the main location in Helmbrechts.

Following cleanroom projects for RAUMEDIC in 2004, 2014 and 2015, the Lindner Group has now been commissioned again to fit out the cleanrooms: Cleanroom ceilings in the form of walkable steel strip grid ceilings Line 100S Type 2 and Clip K3 clamp cassette ceilings provide a clean finish as well as the necessary flexibility. Matching LED recessed luminaires, swing doors and double-shell cleanroom walls of the Multiclean LVT type complete the rooms.

Products

System
Amount
Unit
Clean room ceilings
Clip K3
Line 100S Typ2
Clean room partitions
Multiclean LVT
Multiclean CLVT
Clean room doors
Swing MPH
Clean room light fixtures
RR-o LED-H

Companies involved

Builder: Raumedic AGc/o Rehau AG + Co., Rehau, Germany

Downloads

« Back to list