Description: | The head office of the BERGER GROUP is located in Passau – it is just one of the company's numerous branches. The subsidiary BERGER Bohemia is active in the neighbouring Czech Republic: In Pilsen, a new building for the company has now been built with BERGER Bohemia as general contractor. Lindner contributed 150 m² Plafotherm® E 213 heated and chilled hook-on ceiling to this project. In order to control the indoor climate effectively, this system uses radiation and thus heats and cools effectively. Thanks to its perforation and acoustic insert, it offers good soundproofing properties. In addition, 2,700 m² of linear heated and chilled post cap ceilings of the Plafotherm® B 100 type were installed. The system also uses radiation to optimise the room climate and is longitudinally soundproof. Despite the currently difficult conditions, the project was completed in time. Lindner has already realised several projects with the BERGER GROUP. |