Reconstruction Scharr Headquarters LK50

General

Project: Reconstruction Scharr Headquarters LK50
Building Type: Administration Building
Address: Liebknechtstraße 50
Zip/City: 70565 Stuttgart
Country: Germany
Completion: from 2020 to 2022

Description

Project: Reconstruction Scharr Headquarters LK50
Description:

Friedrich Scharr KG has completely rebuilt its headquarters in Stuttgart: In the course of the LK50 construction project, an innovative office concept with spacious lounge and communication areas was created for the approximately 140 employees. This involved a redistribution of the rooms – away from the interlocking individual rooms and corridors from the 1970s and towards open, flexible office spaces.

The Lindner Group was responsible for the complete interior fit-out and revitalisation of the work areas. For the floor, the FLOOR and more® variant was chosen, a particularly resilient system that impresses with a high level of walking comfort, non-combustibility and optimised acoustics. If you look upwards, you will discover the LMD lamella ceiling and the Plafotherm® heated/chilled ceilings. The AirBox air supply elements also ensure a pleasant supply of fresh air in the office rooms. For elegant room partitioning, Lindner installed various partition wall systems, including the Lindner Logic 100 Timber wooden partition wall and the Lindner Life Pure 620, Lindner Life Clear and Lindner Life Stereo 125 glass partition walls. A special highlight is the Lindner Life Fire fall-proof glazing in F90, which was designed as an impressive interior façade. The interior fit-out was supplemented by various door elements, wall claddings and drywall.

Products

System
Amount
Unit
F0 Metal ceiling
LMD-L 608 275 lm
Heated and chilled canopy ceilings
Plafotherm® DS - Canopy ceilings 1,689 sqm
Plafotherm® L 608 467 lm
Ventilation components
AirBox S 80 31 Pcs.
AirBox S 135 84 Pcs.
Hollow floor systems
FLOOR and more® 2,600 sqm
Glass partitions
Life Fire 100 sqm
Life Clear 450 sqm
Lindner Life Stereo 125 275 sqm
Partitions
Timber partition - Lindner Logic 450 sqm
Doors
Aluminium tubular frame doors - ATB 5 Pcs.
Aluminium tubular frame doors - GTB 57 Pcs.
Dry lining
Dry walls 250 sqm
Dry walls - F90

Companies involved

Architecture: SCD Architekten Ingenieure GmbH, Stuttgart,
Builder: Friedrich Scharr KG, Stuttgart, Germany