STIWA Zubau Trakt C

General

Project: STIWA Zubau Trakt C
Building Type: Office buildings
Address: Salzburgerstraße 52
Zip/City: 4800 Attnang-Puchheim
Country: Austria
Completion: 2019

Description

Project: STIWA Zubau Trakt C
Description:

STIWA Holding GmbH, based in Attnang Puchhein, is an experienced company in the field of product and high-performance automation and has around 2,200 employees. Furthermore, the product and software development for production automation, the supplier production of high-quality metal and plastic components, energy-efficient building technology and laboratory automation are among the core competencies of the Austrian company.

From 2019 to 2020, Lindner was commissioned to design the interior of an office building and an assembly hall. Over 5,000 m² of heated and chilled ceilings, 5,500 m² of floor space and 1,000 m² of dry lining were successfully installed here according to a strict schedule. The integrated Plafotherm® heated and chilled ceiling systems create a pleasant room climate, especially in conference rooms and offices, and fit perfectly into the overall picture thanks to the clean design and the homogeneous ceiling surface. The extremely light raised floor system LIGNA allows the lowest possible emission values ​​and withstands fire for up to 30 minutes. The hollow floor system Floor and more® ensures pleasant acoustics and, with its dark surface, forms a visual contrast to the light room decor.

Products

System
Amount
Unit
Heated and chilled metal ceilings
Plafotherm® B - Post Cap ceilings 3,820 sqm
Plafotherm® E - Hook-On/Corridor ceilings 230 sqm
Parements
Metal stud plasterboard partition systems 750 sqm
Hollow floor systems
FLOOR and more® 190 sqm
Raised floor systems
LIGNA 3,990 sqm

Companies involved

Client: STIWA Holding GmbH, Attnang-Puchheim, Austria

Downloads

« Back to list