Musiktheater am Volksgarten
General
Project: | Musiktheater am Volksgarten |
Building Type: | Concert hall/Theatre/Lecture theatre/Function rooms |
Address: | Blumauerstraße 3-5 |
Zip/City: | 4020 Linz |
Country: | Austria |
Completion: | from 2011 to 2012 |
Description
Project: | Musiktheater am Volksgarten |
Description: | Lindner was responsible for the interior fit-out of the Musiktheater Linz with all acoustical effective surfaces. We furnished the auditorium and the main rehearsal room with ceilings, floors, wall cladding and balcony fronts. The ceiling consists of NORIT-Industrial Boards, some of them with real wood veneer, which stand out due to the their complex 3D forms. Balcony fronts and and a 3D shaped, reflective wall cladding, coated in "beaten" gold, create a comfortable environment. |
Products
System | Amount | Unit |
---|---|---|
Walls | ||
Wall claddings | ||
Partition walls | ||
Ceilings | ||
Ceiling coverings | ||
Balustrades | ||
Balustrade claddings | ||
Tribunes | ||
Tribunes | ||
Hollow floor systems | ||
FLOOR and more® arena |
Companies involved
Client: | Musiktheater Linz GmbH, Linz, Austria |
Architecture: | Terry Pawson Architects, ArchitekturConsult ZT GmbH, dworschak+mühlbachler Architekten, , |